Substrate Treatment & Positioning

3. Surface Preparation: Execute mechanical cleaning followed by chemical degreasing using approved solvents.

4. Precision Alignment: Align artificial ski turf parallel to machine direction, maintaining seam tolerances ≤2mm. Conduct low-speed test runs to verify natural positioning.

Phase III: Adhesive Application & Installation

5. Sectional Installation: Roll back half the material from the centerline.

6. Adhesive Application: Apply uniform adhesive layers using notched trowels, respecting open time specifications.

7. Material Embedment: Gradually unroll sections while implementing cross-rolling procedures to eliminate air pockets.

8. Seam Processing: Maintain tight butt joints without overlap, applying seam reinforcement where required.