3. Surface Preparation: Execute mechanical cleaning followed by chemical degreasing using approved solvents.
4. Precision Alignment: Align artificial ski turf parallel to machine direction, maintaining seam tolerances ≤2mm. Conduct low-speed test runs to verify natural positioning.
Phase III: Adhesive Application & Installation
5. Sectional Installation: Roll back half the material from the centerline.
6. Adhesive Application: Apply uniform adhesive layers using notched trowels, respecting open time specifications.
7. Material Embedment: Gradually unroll sections while implementing cross-rolling procedures to eliminate air pockets.
8. Seam Processing: Maintain tight butt joints without overlap, applying seam reinforcement where required.